| | | | | | | | | With small and 8 Pin socket method, maintenance is easy. | | | With semiconductor method, lifetime is semi-permanent. | | | Completely automatic control of water level prevents the failure of related machines . | | | | | | | | | | Type | M4, M5 | M4 | Sensiblity | AC 110V/220V | | AC 110V/220V 50/60Hz ± 10% | Voltage between electrodes(2nd voltage) | AC 10V | AC 24V | Power consumption | about 3.2VA | about 4VA | Operating resistance | about 4 ㏀ | about 25 ㏀ | Return resistance | less than 15 ㏀ | less than 35 ㏀ | Ambient temperature | -5 ~ +40 ℃ | Insulation resistance | below 100M§Ù(at DC 500V. Meg) | Relay output contact capacity | AC 250V, 2.5A, AC110V 5A (resistance loed) | Relay lifetime | Elextrical : above 500,000 times, Mechanical : above 3,000,000 times | Relative humidity | 45 ~ 85% | | | ※ The surface of electrode bar should be cleaned at least every 6 months. | ※ Insulating film formation on surface of electrode bar causes malfunction. | ※ Electrode fixing coupler(YSFS-3S) should be used in order to get the exact sense distance. | | | | | | | | When Relay Unit nd electrode holder is above 25K§Ù, select high sensitivity. | | | Install electrode holder to water tank and Floatless Switch (Relay Unit) to panel respectively, and then | | | connect to magnet switch. | | | Select Magnet Switch according to pump motor capacity. | | | Use stainless rod or brass road and 4¡5¨ª is suitable. | | | As to the length of electrode abr, select max. and min. limits and set it. | | | | | | | | | |